The therapy pool is getting craned in; but first, copper bonding must be installed for safety. Inside, tile selections are revealed. The integrated entrance ramp gets snow melt and the final layer of concrete. The elevator disconnects are installed.
Broadcast In: English Duration: 0:24:50