As the project winds down, TVs are mounted and the blinds and curtains get installed. Richard takes a look at the new water heater. Jenn watches the final plants go in and helps install outdoor lighting. The old flagpole comes down for a touch up.
Broadcast In: English Duration: 0:24:51