Norm meets up with David Lopes to check out the progress that has been made on the house both outside and in. They find that there has been extensive framing work completed, but unfortunately, a great majority of the house had to be rebuilt due to the dire condition of the structure. Out front, a concrete truck arrives to pour the footing for the new front entry, which will be one of the last sections to be reframed.
Broadcast In: English Duration: 0:24:06